But in order to avoid unnecessarily long explanations, let us look at the practical example of the ECB:
As you easily recognize, the main mast of the crane is anchored in the already finished lower part with traverses.
That would be the variant where the crane simply grows
Accordingly, it is also possible to place a crane at the top of the already built part, or else it is possible to walk along the crane like a migrating formwork, possibly also directly as part of this construction.
Possibility 1 would be for the crane to migrate during construction of a higher building, eg projectiles for projectiles.
Possibility 2 would be that it is a rather small building or This is why a small crane is only active on the ground.
The highest crane is 245m high. This is a bit higher than the Cologne Cathedral.
😀
'Stink normal' cranes under the line.
But in order to avoid unnecessarily long explanations, let us look at the practical example of the ECB:
As you easily recognize, the main mast of the crane is anchored in the already finished lower part with traverses.
That would be the variant where the crane simply grows
Accordingly, it is also possible to place a crane at the top of the already built part, or else it is possible to walk along the crane like a migrating formwork, possibly also directly as part of this construction.
There are various options.