The right to subsequent performance is?, is that: 1 = withdrawal from the contract 2 = repair 3 = two 4 = appropriate 5 = priority?

1 vote, average: 1.00 out of 1 (1 rating, 1 votes, rated)
You need to be a registered member to rate this.
Loading...
Subscribe
Notify of
3 Answers
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
MenschDNA
1 year ago

I don't quite understand the question. With the right to replenishment, you have a right to vote by letting the thing be repaired by the seller, that is, letting the defect be eliminated or you get an exactly the same thing without a defect.

You can consider withdrawing from the contract as soon as there is an impossibility and the seller cannot offer you, for example, the delivery of the defect-free thing because it no longer exists.

SweetKitty36849
1 year ago

1 it is not, and 3 to 5 I do not get.

2 should be the correct answer.