How do you build modern office towers? Does the concrete have to be poured floor by floor so that fresh concrete is constantly being added to fresh concrete?

1 vote, average: 1.00 out of 1 (1 rating, 1 votes, rated)
You need to be a registered member to rate this.
Loading...
Subscribe
Notify of
3 Answers
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Gnurfy
1 year ago

Depending on the type and purpose of structures with tension concrete technology, there are also continuous casting methods with climbing formwork for seam- / and transition-free castings, for example for chimneys or dams.

In other buildings such as office towers, however, the segment is often used for segment, or Floor for flooring with corresponding curing times for sufficient supporting force of supports and intermediate ceilings, because the intermediate ceilings must then be used and loaded.

Only when arming is it possible to work towards the transition into the next segment, even where the next casting is already before.

Losona
1 year ago

I think that's why I'm always dying out these metal bars (whose name I just don't remember)